Skip to content

SPark

spark.bardwaj.in - fellow members convenience initiative

  • "Home"

Type: Image

30May21-email, members group mailid details

30May21-email, members group mailid details
Here is a email id summary as on 30May21. members[at]sandeeppark.com includes 25 members. It does NOT have mail id for 7 members. 1. A002-(jagasia) 2. A004-(lamba) 3. A012-(prabha kumar) 4. Read more
vbAuthor vb Posted on 30 May 2021 Category general Tags group email

25Jul17-drawing3of3-podium2of2

25Jul17-drawing3of3-podium2of2
This drawing, 25Jul17-drawing3of3-podium2of2, is part of a set of three drawing circulated to members via email as a pdf file on 25Jul17. The pdf was converted to a jpg file for easier viewing on a Read more
vbAuthor vb Posted on 25 July 2017 Category drawings Tags drawings email podium

25Jul17-drawing2of3-podium1of2

25Jul17-drawing2of3-podium1of2
This drawing, 25Jul17-drawing2of3-podium1of2, is part of a set of three drawing circulated to members via email as a pdf file on 25Jul17. The pdf was converted to a jpg file for easier viewing on a Read more
vbAuthor vb Posted on 25 July 2017 Category drawings Tags drawings email podium

25Jul17-drawing1of3 ground floor

25Jul17-drawing1of3 ground floor
This drawing, 25Jul17-drawing1of3-ground floor, is part of a set of three drawing circulated to members via email as a pdf file on 25Jul17. The pdf was converted to a jpg file for easier viewing on a Read more
vbAuthor vb Posted on 25 July 2017 Category drawings Tags drawings email ground floor

09Jul17-minutes, concept drawing received on 03July17

09Jul17-minutes, concept drawing received on 03July17
09Jul17 minutes pg1of2 09Jul17 minutes pg2of2 Read more
vbAuthor vb Posted on 09 July 2017 Category minutes Tags minutes concept drawing
Page 1 of 5 ยป

About

place-holder for my residential society matters

Recent posts

  • 11Jun24-members-group-mailid-revised
  • 09Sep23-members-group-mailid-revised
  • 07Aug23-members-group-mailid-revised
  • 22Jul23-email, members group mailid revised
  • 18Jul23-email, members group mailid revised

Popular Posts

  • 09Sep23-members-group-mailid-revised
  • 07Aug23-members-group-mailid-revised
  • 11Jun24-members-group-mailid-revised
  • 22Jul23-email, members group mailid revised
  • 26Aug21-PoD of USV termination

Archives

  • ▼ 2024 (1)
    • June (1)
  • ► 2023 (5)
    • September (1)
    • August (1)
    • July (3)
  • ► 2022 (18)
    • September (1)
    • July (1)
    • June (1)
    • March (12)
    • February (3)
  • ► 2021 (8)
    • August (2)
    • June (3)
    • May (3)
  • ► 2019 (2)
    • June (1)
    • April (1)
  • ► 2017 (22)
    • July (7)
    • June (1)
    • May (1)
    • April (10)
    • March (1)
    • February (2)
  • ► 2016 (2)
    • December (1)
    • September (1)
  • ► 2014 (2)
    • October (1)
    • April (1)

Categories

  • circulars
  • da
  • drawings
  • general
  • Leakage from B602
  • minutes
  • notices

Tags

07Jun21 79a a adjudication annexure area audio b b502 b602 blog builder calculation circular concept da drawing drawings email ground floor group email intimation layout leakage letter MC meeting minutes notice phase3 pmc podium process receipt registrar revised SpGM termination tower USV
  • "Home"
SPark released under CC BY-NC-ND 4.0 licence / Powered by HTMLy